Page 37 - ar2021_en
P. 37
FOCUS
The proposed urban farming and landscaped
park on CWB tunnel portal roof (Upper); and
the current landscaped roof (Lower)
Way Forward
In the course of study, broad technical assessments have been conducted for
the recommended HEPs which demonstrate the technical feasibility of their
implementation. Concerted effort of relevant government departments led by
the HO of the Development Bureau has been made to take forward the HEPs in
collaboration with HC. Noting the strong public aspiration for early provision of
the WCN harbourfront for enjoyment, quick-win projects under the incremental
approach have been taken forward progressively upon the availability of the
concerned sites.
For the detailed design of the HEPs, design ideas competition will be carried
out for the Celebration and Pierside Precincts to tap into the expert and local’s
intelligence and creativity. Detailed design and technical feasibility studies for
HEPs in other Precincts have been/will be conducted in a timely manner.
ANNUAL REPORT 2020/2021 34