Page 37 - ar2021_en
P. 37

FOCUS



































            The proposed urban farming and landscaped
            park on CWB tunnel portal roof (Upper); and
            the current landscaped roof (Lower)


















            Way Forward


            In the course of study, broad technical assessments have been conducted for

            the recommended HEPs which demonstrate the technical feasibility of their

            implementation.  Concerted effort of relevant government departments led by
            the HO of the Development Bureau has been made to take forward the HEPs in
            collaboration with HC.  Noting the strong public aspiration for early provision of

            the WCN harbourfront for enjoyment, quick-win projects under the incremental

            approach have been taken forward progressively upon the availability of the
            concerned sites.


            For the detailed design of the HEPs, design ideas competition will be carried
            out for the Celebration and Pierside Precincts to tap into the expert and local’s

            intelligence and creativity.  Detailed design and technical feasibility studies for

            HEPs in other Precincts have been/will be conducted in a timely manner.




                                                                                 ANNUAL REPORT 2020/2021         34
   32   33   34   35   36   37   38   39   40   41   42