Page 17 - ar2022_en
P. 17

│ EVENTS IN BRIEF

                                   Study on Phase One Development of New
                                   Territories North - San Tin / Lok Ma Chau
                4     th           Development Node





             Quarter               The Department and the Civil Engineering and Development
                                   Department (CEDD) jointly commissioned the ‘San Tin / Lok

                                   Ma Chau Development Node (STLMC DN) Feasibility Study’
                                   in September 2019.  In March 2021, the Initial Land Use
                                   Plan for STLMC DN (about 320 ha) accommodating about
                                   31 000 flats and about 57 ha of economic land for innovation and

                                   technology (I&T) was promulgated.

                                   The 2021 Policy Address announced ‘Northern Metropolis
                                   Development Strategy’.  It proposes, amongst others,

                                   the development of San Tin Technopole by expanding
                                   the STLMC DN to increase the land supply for I&T and
                                   residential uses.  The expanded STLMC DN is envisaged

                                   to provide about 150 ha of I&T land.  Together with the
                                   87 ha Hong Kong-Shenzhen Innovation and Technology Park under
                                   construction at the Lok Ma Chau Loop, it could achieve a clustering
                                   effect of I&T industry with greater economy of scale corresponding
                                   to the Shenzhen I&T zone of more than 300 ha on the northern

                                   shore of Shenzhen River, strengthening the I&T development and
                                   co-operation between Hong Kong and Shenzhen.  Moreover, STLMC
                                   DN will provide 45 500 to 47 500 residential units.  In October 2021,

                                   the Department and CEDD commenced a joint Investigation Study
                                   for STLMC DN to take forward the latest development strategy and
                                   recommend the detailed land uses and supporting infrastructure.























                                        Land to be released from Lok Ma Chau Boundary Control Point will be considered for
                                                                   I&T development







                                                                                                                14
   12   13   14   15   16   17   18   19   20   21   22